Sunshine Coast Waterproofing provides new build waterproofing compliance services for residential, commercial and multi-residential projects across Sunshine Coast, QLD. Our work focuses on preparing and waterproofing wet areas, balconies, roofs, podiums, planters and other moisture-prone building elements in accordance with the project documentation, relevant Australian Standards and applicable construction requirements.
Waterproofing compliance depends on more than the membrane product alone. Substrate condition, floor falls, junction treatment, penetrations, drainage connections, membrane thickness, curing and trade sequencing all affect the completed system. Defects introduced during preparation or by following trades can compromise the waterproofing before tiles, screeds, coatings or other finishes are installed.
We review the waterproofing scope, assess the prepared surfaces and complete the required membrane application and detailing for each area. The work is coordinated with builders, plumbers, tilers and other trades so installation stages, curing periods and access requirements are understood before the waterproofed surfaces are covered.
Request a FREE Quote.
Get the numbers you need to plan with confidence—no pressure, just clear and honest pricing.
New build waterproofing must suit the drawings, specifications, substrate and intended use of each area. We review the available project information and assess the prepared surfaces before application begins. This helps ensure membrane coverage, junction detailing, penetrations and drainage connections are completed according to the requirements of the individual building area rather than using one generic approach throughout the project.
Waterproofing work must be completed with consideration for relevant Australian Standards, manufacturer requirements and the approved construction details. We apply the selected systems with attention to required coverage, reinforcement, curing and substrate preparation. Where site conditions differ from the documentation, the issue should be identified before the membrane is covered by later finishes.
Waterproofing is affected by the work completed before and after membrane application. We coordinate with builders and relevant trades around plumbing penetrations, screeds, wall linings, drainage points, tiling and fixture installation. Clear sequencing helps reduce the risk of membranes being applied to incomplete surfaces or damaged by traffic, tools and later construction work.
Residential New Build Waterproofing
Residential new builds require waterproofing across bathrooms, ensuites, laundries, balconies, roofs, planters and other specified areas. We prepare the substrates and detail floors, walls, junctions, wastes and penetrations before applying the required membrane systems. The work is coordinated with builders and following trades so each waterproofed area is protected and completed in the correct sequence.
Commercial and Multi-Residential Builds
Commercial and multi-residential projects often involve repeated wet areas, larger roof and podium surfaces, plant rooms and shared external zones. We complete the waterproofing area by area while maintaining consistent detailing across multiple rooms, levels and substrates. Staging, curing and membrane protection are coordinated with site access and the wider construction program.
Compliance Rectification Before Handover
Waterproofing defects identified before handover may include damaged membranes, incomplete junctions, exposed penetrations or insufficient coverage. We assess the affected area and complete compatible repairs before tiles, coatings or other finishes are installed. Broader membrane replacement may be required where the existing system is contaminated, punctured in several places or unsuitable for localised rectification.

Bathrooms, showers, ensuites and laundries require waterproofing coverage and detailing suited to the room design and expected water exposure. We prepare and membrane floors, required wall areas, junctions, wastes and penetrations before the final finishes are installed.
• Bathrooms and ensuites
• Shower floors and walls
• Laundry wet areas
• Floor wastes and thresholds
• Wall-to-floor junctions
Balconies and terraces require waterproofing that works with falls, drainage, thresholds, wall junctions and the selected trafficable finish. We apply compatible systems over prepared substrates and detail vulnerable connections before screeds, tiles or coatings are installed.
• Tiled balconies
• External terraces
• Door thresholds
• Balustrade penetrations
• Drainage outlet connections


Flat roofs, podiums and rooftop areas require continuous membrane coverage across slabs, upstands, joints, outlets and penetrations. We coordinate installation with drainage, protection layers and final finishes to help maintain the system through later construction stages.
• Flat and low-slope roofs
• Podium slabs
• Parapets and upstands
• Roof outlets and penetrations
• Membrane protection requirements
Built-in planter boxes require waterproofing beneath drainage media, soil and landscaping. We membrane the base and internal walls, treat corners and outlets, and coordinate the system with root protection and drainage layers before the planter is filled.
• Concrete and masonry planters
• Base and wall membranes
• Outlet and overflow detailing
• Root-resistant systems
• Waterproofing before landscaping


Pipes, floor wastes, corners, thresholds and changes in substrate interrupt otherwise continuous waterproofed surfaces. We reinforce and seal these areas so the membrane connects correctly around each opening and transition.
• Plumbing penetrations
• Floor waste connections
• Internal and external corners
• Wall and slab junctions
• Changes in substrate material
Membranes may be damaged by tools, foot traffic, later trades or incomplete preparation before they are covered. We assess the affected area and complete suitable repairs or replacement where the surrounding system remains compatible.
• Puncture and tear repairs
• Damaged membrane sections
• Failed junction detailing
• Surface contamination assessment
• Rectification before finishing work

New build waterproofing must account for relevant Australian Standards, the National Construction Code, approved project documentation and the requirements of the selected membrane manufacturer. The applicable details vary between internal wet areas, balconies, roofs, planters and below-ground structures. The waterproofing scope should be reviewed against the specific building area rather than applying one standard detail everywhere.
The builder or principal contractor generally coordinates the construction sequence, access and interaction between trades, while each contractor remains responsible for the work within their scope. Waterproofing relies on completed substrates, correct plumbing penetrations, drainage preparation and protection from later trades. Clear coordination is required before and after membrane application.
Waterproofing should not normally be completed before required penetrations, wastes and service openings are finalised. Creating new openings after membrane application can damage the system and leave poorly sealed edges around the penetration. All relevant plumbing and service points should be confirmed before waterproofing begins where practical.
A damaged membrane should be assessed and repaired before tiling or other finishes are installed. The affected section may require cleaning, preparation and a compatible repair that overlaps onto sound surrounding material. Widespread damage, contamination or uncertain compatibility may require removal and broader replacement.
New build waterproofing must cure for the period specified by the membrane manufacturer before screeds, tiles, coatings or other finishes are installed. Curing time depends on the product, number of coats, substrate, temperature and humidity. Covering the membrane too early may affect adhesion, thickness or overall performance.